5th DC Calibration (Mar31/2011 - Apr01/2011)
The 5th DC-Calibration has done from mar31/2011 to Apr01/2011.
The following are the reference runs which I used for DC-Calibration in each interval and sub-interval.
I have checked each run status using Calibration Database Query Page. I think everything is ok.
If you click each run, you can have detail information.
1. The reference run
As the next step, I checked the cooking time of runs using MYSQL DATA-BASE.
By the following, there are cooking jobs between Apr05/2011 and Apr06/2011.
These jobs are requested after 5th DC calibration by me.
I think jobs by dennice have done at Apr11/2011 and Apr12/2011.
Brian was submitted some runs at Apr18/2011 by my request. But these information are not updated.
I think if some thing is changed, they are happened between Apr12/2011 and Apr18/2011.
2. The cooking information on MYSQL DATA-BASE